The AOV Commissioning Certificate Template UK is offered in multiple formats, including PDF, Word, and Google Docs, featuring customizable and printable examples.
Aov Commissioning Certificate Template UK Editable – PrintableSample
AOV Commissioning Certificate Template UK 1. Client Information 2. Service Provider Information 3. Installation Details 4. Test and Commissioning Details 5. Compliance and Standards 6. Configuration and Settings 7. Maintenance Recommendations 8. Safety Checks 9. Client Acknowledgment 10. Signatures and Agreement 11. Declaration and Signatures
PDF
WORD
Examples
[Name of the Building Owner]
[Owner’s ID]
[Owner’s Address]
[Owner’s Phone]
[Owner’s Email]
[Name of the Contractor]
[Contractor’s ID]
[Contractor’s Address]
[Contractor’s Phone]
[Contractor’s Email]
This certificate confirms the successful commissioning of AOV (Automatic Opening Vent) systems in accordance with UK regulations, ensuring proper ventilation in the event of a fire.
The Contractor has completed the installation and commissioning of AOV systems in the following areas: [Specify areas, e.g., stairwells, corridors, and atriums].
Confirming that the AOV systems are operational and have been tested on [Date of Testing] under the supervision of qualified personnel.
The system complies with the UK Building Regulations and relevant standards, including [List applicable standards, e.g., BS 9999, BS EN 12101].
It is recommended that the AOV systems be inspected and maintained regularly, with suggested intervals of [Specify intervals, e.g., every six months].
This commissioning certificate is signed on [Date] in [City].
[Signature of the Building Owner]
[Name of the Building Owner]
[Signature of the Contractor]
[Name of the Contractor]
[Name of the Facility Manager]
[Manager’s ID]
[Manager’s Address]
[Manager’s Phone]
[Manager’s Email]
[Name of the AOV Installer]
[Installer’s ID]
[Installer’s Address]
[Installer’s Phone]
[Installer’s Email]
This document certifies that the AOV systems have been commissioned satisfactorily, providing assurance of effective operation for smoke control strategies.
The AOV systems installed include [List types of AOVs, e.g., roof vents, side vents] across designated escape routes.
Testing was conducted on [Specific Dates] to ensure compliance with operational requirements, detailing the methods and results of the tests.
The installation meets all current fire safety regulations and is deemed fit for purpose, adhering to [List standards, e.g., Approved Document B].
Regular checks and tests should be carried out yearly, and a full review of the system should be conducted every [Specify years, e.g., three years].
This certificate is accepted by both parties, signed on [Date] in [City].
[Signature of the Facility Manager]
[Name of the Facility Manager]
[Signature of the AOV Installer]
[Name of the AOV Installer]
Printable
